accountarrow-leftarrow-rightbincartcart2check-circlecheck-whitecheckcrosscustomer-servicedeliverydesigndishwasherdouble-drawersdouble-machinedrawer-unitdrawersemailforwardfridgegrid-dotshelp-talkhelpinfoinfo2installlayoutlinen-cupboardlong-hangmeasuremicrowaveovenpantrypencilphonepinplusquestionresizeshareshelving-unitshoe-shelvesshort-hangsingle-machinetickturnaroundzoom
Skip to content

Overview

Now you have a group of cabinets fixed together, it's time to work from one end to the other with your level to ensure the top and bottom is level and the left and right sides are square and level to the base and top across all cabinets. Also check your kicker height at 144 in height prior to fixing to wall, you may need to adjust the feet to and start the level process from the start if required.

If you are now ready to fix the cabinets use your level against the level markings made on the wall frames (go back to our Installation Planning section if you have not done this step) to mark hole positions on the back of the cabinet in each stud top and bottom.

Once predrilled use your 65mm screws to fix into wall stud being careful not to over tighten which will pull your cabinet out of level.

Free Check Measure on
all Cabinet Orders
Metro & Rural
Delivery Available
Quick Manufacturing
Turnaround
Installation
Available
South Australia

Owned & Manufactured